What's new in Spider Project
Spider Project version 10.02 release 05 - from 3.08.2010
-
The syntax of the command DOCFIELDSETPROP is changed.
Spider Project version 10.02 release 01 - from 27.07.2010
-
ATTENTION! The project file format changed to 10.02. To open project saved by the new version in the old version use CSV export / import.
-
The graphs in Gantt diagram can be printed separately. Menu item "Print Diagram" in the diagram pop-up menu.
Spider Project version 10.01 release 84 - from 20.07.2010
-
Export to the format Primavera XER.
-
New script command PROJXEREXPORT - export a project to XER-file.
-
The syntax of the command SETARPS is changed.
Spider Project version 10.01 release 78 - from 8.07.2010
-
New menu item "Update Version Number" in the pop-up menu of corporate reference-books.
-
The syntax of the command PROJTABDBEXPORT is changed.
Spider Project version 10.01 release 67 - from 11.06.2010
-
New menu item "Expand / Collapse materials" in the pop-up menus of activities, phases
and assignments. Materials consumption is shown in the material rows in the new columns
"Consumption" with corresponding postfixes.
-
FTP servers setup allows to use passive mode and to check connection to server.
-
The syntax of the command SETFILEEXPIMP is changed.
-
The main WBS only can be exported to CSV-files.
Spider Project version 10.01 release 66 - from 25.05.2010
-
New option "Allow to run multiple instances of Spider Project" in the "Spider Project Parameters" window.
Spider Project version 10.01 release 65 - from 21.05.2010
-
The action "Autofit Columns" considers now the number of rows in a cell.
-
A user defined period can be used in reports.
Spider Project version 10.01 release 63 - from 18.05.2010
Reference-books:
-
Reference-books of the type "Formulae" is applied now to the formulae of a document.
-
Reference-books of the type "Filters" is applied now to the filters of a document.
Scripts:
-
The script window has changeable size.
-
New script command PROJTABDELETEOBJECTSALL (tab) - delete all objects form the project table.
-
The syntax of the command SETMAINOPTIONS is changed. The password protected projects can be open in scripts.
-
In the script window there is a pane where errors are shown.
-
SCNF-files can be used in the script command PROJTABLOADCONF.
-
New script command PROJTABAPPLYCONF - load a configuration from the project configuration
table into Gantt diagram.
Spider Project version 10.01 release 49 - from 16.04.2010
Formulae:
-
Single cell values from different project tables can be used in formulae.
-
More detailed description will be here later.
Spider Project version 10.01 release 48 - from 15.04.2010
-
Project comparing process, resource peak work load calculation can be cancelled.
Formulae:
-
Single cell values can be used in formulae.
-
Values from neighbour rows can be taken.
-
More detailed description will be here later.
Spider Project version 10.01 release 47 - from 14.04.2010
Spider Project version 10.01 release 45 - from 6.04.2010
-
Access rights to standard columns.
Spider Project version 10.01 release 44 - from 2.04.2010
-
Activities have the new field "Preceding link is broken".
Scripts:
-
New script command SETMAINOPTIONS - set main settings.
-
New script command DOCSETTRANSFERFIELDSALL - make all the document fields transferable.
Export-Import:
-
New table in the project data base "matset_cost".
New fields "f_BrokenLink" and "f_ResourLink" are added into the table "link".
New fields "ReservFinH", "ReservFinD", "ReservSuperH", "ReservSuperD", "FinSuperAlap"
are added into the table "oper".
New fields "ReservFinH", "ReservFinD" are added into the table "wbs_cont".
-
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 10.01 release 41 - from 18.03.2010
-
New option in the resource constrained scheduling - "Create resource dependences".
New option in Gantt diagram - "Hide resource dependences".
New field in the "Links" table - "Resource Dependence" with values "Yes", "No".
-
The following functions can be used in formulae:
#RowNumber - row number
#CurrentDate - current date
#DataDate - project data date
#TargetFinish - target finish
#ProjCode - project code
#ProjVersion - project version
#ProjName - project name
Spider Project version 10.01 release 40 - from 17.03.2010
-
In phase (department) property window on the pane "Activities" ("Resources") there is the new button "Move from other phases" ("departments").
Script Language:
-
The syntax of the DOCFILEEXPORT command is changed.
-
The syntax of the DOCHTMLEXPORT command is changed.
-
The syntax of the DOCTEXTEXPORT command is changed.
Spider Project version 10.01 release 36 - from 5.03.2010
-
New option in "Spider Project Parameters" dialog - "Use two monitors".
Spider Project version 10.01 release 35 - from 3.03.2010
-
New option in "Comparison Setup" dialog - "Show compared project schedule".
-
New options in "Gantt diagram options" - "Hide activities canceled by switch",
"Show compared schedule", "show critical schedule".
-
Volume can be a parameter in EVA.
Script Language:
-
New script command PROJSETEVAREPCOMMONALL - set the field list for EVA report.
-
The syntax of the PROJSETEVAREPCOMMON command is changed.
-
The syntax of the PROJSETEVAREPPAR command is changed.
Spider Project version 10.01 release 32 - from 26.02.2010
-
Script files should have the extention SPSC so that they will have their own pictogram in Windows Explorer
and can be run from Windows Explorer by double-click.
The obsolete method of script running is also supported:
sp.exe /s exec script.txt
-
Materials, material sets, material centers and user defined fields can be used as parameters in EVA.
Spider Project version 10.01 release 31 - from 25.02.2010
-
New menu item "Calculations / Synchronize optimistic, pessimistic and probable versions"
-
Configuration files (SCNF files) have their own pictogram in Windows Explorer.
-
Opening projects from Windows Explorer has been corrected..
Script Language:
-
New script command PROJSYNCACTUALDATA - Synchronize optimistic, pessimistic and probable versions.
Spider Project version 10.01 release 30 - from 18.02.2010
-
In the pop-up menu of a group of selected activities
there is a new menu item "Link / Delete links between selected".
-
In demo version with the restriction "40 activities" in every project window title
the number of already created activities is shown.
Spider Project version 10.01 release 29 - from 17.02.2010
-
New way of creating links quickly. In the pop-up menu of a group of selected activities
there is a new menu item "Link" with subitems "As a Chain", "Selected to One", "One to Selected".
Script Language:
-
New parameter "All" in command PROJSETGANTT - corresponds to the item "Whole Project"
in the Gantt scale pop-up menu.
Spider Project version 10.01 release 28 - from 16.02.2010
-
New activity fields "Finish [Latest]", "Float Super, Days", "Float Super, Hours".
Configurations:
-
A configuration can be set up for the new created projects. The configuration should be
previously saved in a SCNF-file. The Gantt diagram placement is also stored in the configuration.
To set it up the menu item "Option / Parameters" or the button "Parameters" in the main window should be used.
Spider Project version 10.01 release 26 - from 15.02.2010
Gantt diagram:
-
Graphic diagrams can be moved by left mouse button.
-
The boundary of diagram area can be moved by left mouse button.
-
The diagram area can be scrolled.
Spider Project version 10.01 release 23 - from 5.02.2010
-
New columns in the material set table - cost per unit.
-
The portfolio materials and costs can be considered by project scheduling with the option
"Consider Portfolio" switched on.
Spider Project version 10.01 release 18 - from 26.01.2010
-
New activity fields "Float Finish Total, Hours" and "Float Finish Total, Days".
Script Language:
-
New script commands DOCSETCONNECTINGFIELDS2, DOCSETCONNECTINGFIELDS3, DOCSETCONNECTINGFIELDS4 -
set special connecting fields of a document.
Spider Project version 10.01 release 12 - from 30.12.2009
-
New menu item in Gantt diagram "Activities with visible links only".
-
New menu item in Gantt diagram "Visible links only".
Configurations:
-
New drop-down list "Configurations" in Gantt diagram. Gantt diagram configuration can be
saved in SCNF-file as well as in the project in new table "Configurations" by subitems of menu
"Gantt / Configuration". So, user can quickly switch between different Gantt configurations
and also load them in other projects.
Spider Project version 10.00 release 55 - from 24.11.2009
-
New activity type DPH - "Switch".
-
New link property - "Condition of Switch".
-
The resource availability can be shown on the Resource-Hours diagram.
-
New user property - whether he is allowed to open portfolio.
-
New resource property - whether its resource-hours is added to activity resource-hours.
-
"Group undo" can be performed in the "Protocol of Actions" table.
Script Language:
-
The syntax of the SETFILEEXPIMP command has been changed.
Spider Project version 10.00 release 43 - from 15.09.2009
Script Language:
-
New script command PROJMSPXMLEXPORT - export project to MS Project XML-file.
-
New script command PROJANYGANTTEXPORT - export Gantt diagram to AnyGantt component.
-
New script command CREATEPROJMSPXML - create new project from MS Project XML-file.
Spider Project version 10.00 release 42 - from 10.09.2009
-
The structure codes unicity is checked after a project is imported.
Export-Import:
-
The Gantt diagram can be exported into an XML-file to be viewed by the flash Gantt component "AnyGantt".
(The "AnyGantt" demo is here: www.anychart.com/products/anygantt/overview).
Gantt diagram
-
The scrolling synchronism of different diagram parts is corrected.
Spider Project version 10.00 release 37 - from 26.08.2009
Gantt diagram
-
New scale option - quarter's number in the project.
-
Scale range is expanded to 10-minutes intervals.
-
Any text on the scale is centered on the VISIBLE part of a cell (so, does not disappear by scrolling).
-
New function "Whole project" in the scale's pop-up menu. It shows the whole project
on the visible part of the Gantt diagram.
Spider Project version 10.00 release 36 - from 25.08.2009
Gantt diagram
-
New scale options:
- Year's number in the project
- Month's number in the project
- Week's number in the project
- Month's number in a year
Scale range is expanded. It can be from several hours per screen to about 50 years.
Spider Project version 10.00 release 21 - from 2.06.2009
Script Language:
-
The syntax of the CLOSEALL command has been changed.
Spider Project version 10.00 release 17 - from 15.05.2009
Gantt diagram
-
New Option: whether to use colors in the actual part.
-
The collapsed phases can be colored using the custom colors of subphases.
The priority of subphases can be set up using the button "Priority".
It can be direct, reversed or by parameter.
Spider Project version 10.00 release 11 - from 6.05.2009
Interface:
-
The custom colors of phases are used in the actual part of Gantt diagram.
-
The data transfer from a reference book can be performed without closing the dialog window.
-
Window coordinates saving is corrected.
Script Language:
-
The syntax of the DOCFIELDSETPROP command has been changed.
Export-Import:
-
The field "TeamCode" is added into the tables "ass", "assresmult" Ё "assrespool".
The field "ContentCodes" is added into the tables "signal", "report", "evareport", "trendreport", "trenddifreport".
The fields "ContentCodes" and "ContentNames" are added into the tables
"resmult", "respool", "matcenter", "rescenter", "costcenter", "calen", "res", "userfield", "right".
The fields "ContentCodes", "ContentNames", "Unit" are added into the table "matset".
-
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 10.00 release 7 - from 21.04.2009
Interface:
-
The column name prefixes "Comparison" and "Difference" can be changed in Spider Project
Parameters window by the button "Column Names".
-
New filters in the Activity Gantt diagram main menu "Activities without Predecessors Only" and
"Activities without Successors Only".
-
New field "Drag" in Activity Gantt diagram. It shows how much the project duration will be
reduced if the corresponding activity duration is set to zero.
-
The Standard Reference-books "Current WBS", "Current OBS", "Current PBS" can contain
objects (activities, resources, projects). The option name is "Structure with objects" in
the "Create Standard Reference-book" dialog window.
Spider Project version 10.00 release 5 - from 16.04.2009
Interface:
-
New interface of the window "Projects and Documents" completed.
-
In all the dialog windows with the new interface You can sort lists by pressing a column title.
Columns can be moved by the mouse.
Script Language:
-
New script command DOCDELFIELD - delete field from the document
-
New script command DOCADDFIELD - add field to the document.
-
New script command DOCFIELDSETPROP - set the document field properties.
Export-Import:
-
Export / import of projects in / from MS Project in XML format.
Spider Project version 9.19 release 92 - from 20.03.2009
-
New look of the window "Projects and Documents". It has changeable size and rememberes
the size and position.
-
All the dialog windows and the main window remember size and position.
-
New menu item "Risk Analysis" in the pop-up menu of an activity or a phase.
- New menu items in the pop-up menu of an activity or the group of them in the submenu "Filter":
"All Preceding Activities",
"All Succeeding Activities",
"Activities Linked to Selected Only",
"All Preceding Links",
"All Succeeding Links",
"Links to Selected Activities Only ",
-
To cancel the filters on the links the main menu item "Cancel filter on links" should be used.
Spider Project version 9.19 release 87 - from 13.03.2009
- User defined names can be given to the additional fields of reports.
Export-Import:
- The fields "f_DRAGH" and "f_DRAGD" has been added into the table "oper".
- Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.19 release 82 - from 9.02.2009
- Now it is possible to color the bars in the Gantt diagrams in dependence on chosen parameter.
The parameter and the signal can be chosen in the "Options" window.
- MIRR can be calculated.
Spider Project version 9.19 release 80 - from 30.01.2009
Spider Project version 9.19 release 57 - from 22.10.2008
- The new feature - Autosave. The autosave period is set in the main window menu "Options / Parameters".
Autosave is performed into a temporary file with extention ".{TempFile_1234567_7654321}".
- User fields can be used in the cost components formulae.
- User can define the path to the log file.
- Now it is possible to add columns into a document from other document even if column codes coincide.
In the case the following option must be used:
"If column codes coincide - generate unique code".
Script Language:
- New script command CREATESTORAGE - create storage.
- The syntax of the SETADDCOLUMNDOC command has been changed.
Spider Project version 9.19 release 49 - from 2.10.2008
- In Gantt diagrams filters can be applied to the group objects (phases, departments, projects).
Script Language:
- The syntax of the SETFILTERAPPLY command has been changed.
Spider Project version 9.19 release 46 - from 23.09.2008
- Now it is possible to cut, copy and paste lines in documents and some project tables.
Spider Project version 9.19 release 43 - from 5.09.2008
- New command in the main window menu - "Close All"
- Report templates can reference to a print templete.
- MIRR of a project can be calculated.
- New columns in the following tables "materials", "material periods", "overtime", "resource periods":
comparison by cost components.
- Discount period can be defined in quarters.
Script Language:
- New script command PROJTABDELETEOBJECTS - delete objects from a project table.
- New script command DOCSETCONNECTINGFIELDS - set the connecting fields of a document.
- New script command DOCSETTRANSFERFIELDS - set document fields for transferring.
- New script command DOCCLEARCONNECTINGFIELDS - clear the list of connecting fields.
- New script command DOCCLEARTRANSFERFIELDS - clear the list of fields for transferring.
- New script command PROJCALCMIRR - calculate project MIRR.
- The syntax of the PROJSETCOST command has been changed.
- The syntax of the SETDISTRPROJ command has been changed.
- The syntax of the PROJSETCOST command has been changed.
Export-Import:
- The field "f_PrintTemplate" have been added into the tables "report", "trendreport",
"trenddifreport" and "evareport";
- The field "f_MIRR" has been added into the tables "projport", "pbs_cont";
- The field "f_Capital" has been added into the tables "cost";
- Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.19 release 32 - from 30.05.2008
- In tables the current column and the current row are highlighted.
New option for histograms and graph in Gantt diagrams
(diagram pop-up menu, item "Properties"):
- Values only can be shown.
- Graphs only can be shown.
- Values over graphs can be shown.
- Number of digits after decimal point can be defined.
Script Language:
- The syntax of the PROJSETSPENDREP command has been changed.
- The syntax of the PROJSETTRENDREP command has been changed.
- The syntax of the PROJSETTRENDVARREP command has been changed.
- The syntax of the PROJSETEVAREP command has been changed.
Export-Import:
- The fields "sf_OnlyTop", "sf_ShowGraphs", "sf_ShowDigits" and "f_OutputFormNum"
has been added into the tables "report", "trendreport", "trenddifreport" and "evareport".
- Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.19 release 22 - from 21.04.2008
- The setup of the number of digits after decimal point affects now the diagram scales.
Activity Network:
- The project general information can be shown (Start, Finish, Duration, Expense, NPV, IRR).
- The toolbar on the left side for switching project pages.
- The critical chain of links is shown in bold red.
- Possibility to colour activity bars in dependence on chosen parameter. The parameter and
the signal can be chosen in the "Options" window.
- There are menu and buttons for scheduling and expense calculation.
- More options in the template setup window.
Printing:
- New button on the toolbar in preview "Don't print the last vertical column of pages".
Script Language:
- New script command PROJPORTFOLIOUPDATECURR - update portfolio from the current version.
- New script command PROJPORTFOLIOUPDATENEW - update portfolio from the new version.
- New script command PROJPORTFOLIOCONSOLIDATE - consolidate the portfolio projects.
- New script command PROJPORTFOLIODISTRIBUTECURR - distribute the portfolio projects as the current version.
- New script command PROJPORTFOLIODISTRIBUTENEW - distribute the portfolio projects as the new version.
- The syntax of the SETFILEEXPIMP command has been changed.
Export-Import:
- New table "res_prod_res" in import/export database. This table contains data about
resource production by time, and table "res_prod" now contains only resource
production on activities.
- Now the tables "wbs_cont", "obs_cont", "pbs_cont", "oper", "ass", "res", "projport"
contain all the fields "DurFact", "DurFactD", "DurSum", "DurSumD"
- Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.19 release 5 - from 23.01.2008
- The following date formats can be used: Month-Day-Year, Day-Month-Year, Year-Month-Day
and in Date-Time Format dialog there is a button for system settings.
Spider Project version 9.19 release 4 - from 15.01.2008
- New scheduling option: ascending or descending order of assignment priorities inside resource skills.
Script Language:
- New script command PROJTABSORTCOLUMNS - sort project table by several columns.
- New script command DOCSORTCOLUMNS - sort document by several columns.
- The syntax of the PROJSETSCHED command has been changed.
Export-Import:
- Now by importing a project from MS Project data base the order of phases keeps being invariable.
- The field "Invert" has been deleted from the table "evareport";
Details: see corresponding topics by the "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.19 release 2 - from 18.12.2007
- New project comparison option "Subtract from baseline".
Script Language:
- New script command PROJSETCOMPARE - set project comparison options.
- The syntax of the DOCAPPLYFILTER command has been changed.
Export-Import:
- The fields "SkipInCalc" has been added into the tables "matper" and "resper"
Details: see corresponding topics by the "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18 release 39 - from 4.12.2007
- Formulae can be performed automatically after transferring the actual data into a project.
Export-Import:
- The field "f_ApplyAfterMonFact" have been added into the table "formula";
Details: see corresponding topics by the "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.33 - (from 16.11.2007)
- New script command PROJSTRUCTDELETE - delete structure.
Spider Project version 9.18.28 - (from 24.10.2007)
- New fields in Gantt chart: "Notified about start" and "Notified about finish".
EXPORT-IMPORT:
- The fields "f_NotedStart" and "f_NotedFin" have been added into the tables "ass" and "wbs_cont";
Details: see corresponding topics by the "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.24 - (from 14.09.2007)
EXPORT-IMPORT:
- The new option "Proceed step by step" has been added in the script creation dialog.
- The new button "Save as script" for saving the script into the script table
of the project has been added in the script creation dialog.
Spider Project version 9.18.21 - (from 5.09.2007)
EXPORT-IMPORT:
- The fields "ResCentQuan" and "ResCentHour" have been added into the table "oper".
Details: see corresponding topics by the "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.19 - (from 21.08.2007)
- New function can be used in formulae:
Replace (<string>, <from position>, <new string>) - replaces the part of the given string
from the given position by the new string.
EXPORT-IMPORT:
- The fields "f_ExPeriod" and "f_ExPeriodUnit" have been added into the table "except";
field "f_OutputFormNum" - into the tables "cost", "costcenter", "matcenter", "matset";
fields "f_OutputFormNum", "f_OutputFormTime", "f_OutputFormText" - into the tables "standfield", "userfield"
Details: see corresponding topics by the "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.18 - (from 17.08.2007)
- Any periodic calendars.
In the calendar exception properties window it can be defined that the exception recurs
every N periods of time (minutes, hours, days, weeks, months, quarters, years).
In the calendar exceptions table the fields "Recurrence Period" and "Unit of Recurrence Period"
contain this information. In such a way the anniversary holidays (and any holidays that recurs
every period of time) can be defined. In the new created projects New Year and Christmas
are assigned to the main calendar by default.
- Every field has the following options (they can be set up in the field properties window):
- numerical: number of digits after decimal point,
- date-time: whether to show hours and minutes,
- text: left / right alignment.
- The scheduled resource quantity of Resource Departments is calculated.
Spider Project version 9.18.17 - (from 7.08.2007)
- Now the parameter name can be changed during creation of report.
- The field "Name" has been added into the tables:
"report_par", "trendreport_par", "trenddifreport_par" and "evareport_par" of export/import data base.
Details: see corresponding topics by the "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.16 - (from 3.08.2007)
- Two new functions can be used in formulae:
SubString (<string>, <from position>, <substring length>) - returns the part of the given string;
FindString (<where to search>, <what to search>, <from position>) - returns the number of position
in the given string, where the substring being searched for begins.
If the search failed, the function return zero. The function can be used as the condition
by the function "if" because the function "if" treats zero as "false" and other values as "true".
- Now filters can be sorted and searched for by code and name in the window "Filters".
Also the contents of the selected filter is shown.
Spider Project version 9.18.14 - (from 30.07.2007)
- Now the links of the types "Finish-Finish" and "Finish-Start" can have a volume lag.
The volume of the succeeding activity is used.
Spider Project version 9.18.13 - (from 26.07.2007)
- Formulae: now the apostrophized date-time constants can be used by the comparison operators
(<, <, =, !=, and so on) and by the functions Diff_Days and Diff_Hours.
- The new report option "Dates in the separate column".
- The syntax of the PROJSETTRENDREP, PROJSETTRENDVARREP, PROJSETSPENDREP, PROJSETEVAREP commands
has been changed.
- The fields "DefOperDur", "DefOperDurUnit", "DefTeamName" have been added into the "proj" table of data base.
The field "sf_SeparateDate" has been added into the tables "report", "trenddifreport", "evareport", "trendreport".
Details: see corresponding topics by the "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.11 - (from 24.07.2007)
- The additional options in the project properties (the button "Additional"):
a user can define the name of the resource teams and the default duration of the newly created activities
Spider Project version 9.18.9 - (from 13.07.2007)
- The command PROJSETCOMPARE does not exist any more.
- The syntax of the PROJSETRISK command has been changed.
Spider Project version 9.18.8 - (from 11.07.2007)
- The export/import from MS Project supports the resource production.
- The new option "Skip Blank Values" has been added in the creating structures by codes.
- Add the new script command "DIAGRAM" - create reports or diagrams.
- The new option in the creating standard reference books - create from the whole table or
from the filtered part of the table.
- The resource production can be performed not only by activities but also at the time moment
defined in resource properties window (page "Resource Production", button "Time").
- New field "Start" have been added into "res_prod" table.
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.6 - (from 19.06.2007)
- The fields "Float, Days" and "Float, Hours" have been renamed to "Float Total, Days" and "Float Total, Hours".
- The Standard scheduling method is available in the LITE version of Spider Project.
- The Report Template reference-books store the information about diagram colors.
- The new parameter "Credit Percent" can be used in reports.
- The syntax of the PROJSETSPENDREPPAR command has been changed
- Distributing and consolidating of monitoring documents now available in Desktop
- New fields "sf_CreditPercent" and "f_Credit" have been added into "report_par" table.
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.5 - (from 8.06.2007)
- Activity links have new property "Driving". If activity start date depends on the link then this link is
Driving with "Yes" in the property field. Otherwise property field has "No" value.
- Resource assignment productivity will be calculated automatically if "Calculate Productivity" item
is selected in the assignment Pop-up menu in the Assignments table, Activity or Resource Gantt Chart.
- The "Free float" field has been added to the Activity properties. Activity execution can be postponed
for free float period without affecting the planned dates of other activities execution.
- New Priority field has been added to the Scheduling options dialog window. This priority defines
priorities for resource selection during skill scheduling.
- The syntax of the PROJSETSCHED command has been changed.
- New fields "f_FreeReservH" and "f_FreeReservD" have been added into "oper" table, field "Main" - in table "link".
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.3 - (from 24.05.2007)
- The report option "Expand Centers" works for material sets also.
- Now data form reference-books can be transferred into filtered part of a document or a project table.
- The syntax of the command SETDOCAPPLY has been changed.
EXPORT-IMPORT:
- New field "f_ToFiltered" have been added into "corpref" table.
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.18.1 - (from 22.05.2007)
- Now there are three methods of data transfer from reference-books to projects:
1. Full transfer.
2. Transfer to existing rows only.
3. Creating new rows.
- Now corporate reference-books can use the specified filter before data transfer to a project table.
So, only filtered rows will be affected.
- The syntax of the command SETDOCAPPLY has been changed.
Spider Project version 9.17.8 - (from 10.05.2007)
- While calculating costs, the remaining consumptions will be calculated also for multi-resource assignments,
resource skill assignments and teams.
- There is a new possibility in the log to view which user has made a change in the project.
EXPORT-IMPORT:
- New tables have been added to the data base:
assteam_cost - cost component consumption by teams;
assteam_mat - material consumption by teams;
assteam_matset - material sets consumption by teams;
assteam_center - team's cost and material centers;
assresmult_cost - cost components consumption by multi-resources;
assresmult_mat - material consumption by multi-resources;
assresmult_matset - material sets consumption by multi-resources;
assresmult_center - multi-resource's cost and material centers;
assrespool_cost - cost component consumption by resource skills;
assrespool_mat - material consumption by resource skills;
assrespool_matset - material sets consumption by resource skills;
assrespool_center - resource skill's cost and material centers;
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.17.6 - (from 23.04.2007)
- New option "Show hours and minutes" in the document properties.
Spider Project version 9.17.5 - (from 17.04.2007)
- The automatic calculation of the actual material cost is performed during the consolidation of the monitoring documents.
Spider Project version 9.17.3 - (from 13.04.2007)
- New field "filter_f_FilterKind" has been added into the "filter" table:
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.17.1 - (from 30.03.2007)
PRINT:
- New option to print a logo in any corner of page.
The logo can be added to any diagram, project table or document.
- New option to print a legend in the Gantt diagram.
Both the logo and the legend can be printed on the first, last or all pages.
- Now the print settings can be saved not only as a new template but also as an existing template.
EXPORT-IMPORT:
- New fields have been added into "printpat" table:
f_LogoCorners, f_LogoPage, f_LegendPage, f_LogoFileName.
Details - see corresponding topics by "Help / CSV and DB Import-Export" menu item.
Warning: be sure to update data base structure before using it.
Spider Project version 9.16.18 - (from 22.02.2007)
- New possibility to print title and subtitle of the documents only on the first page.
- Changes made in the page setup dialog window (changing printer, orientation, margins, page size, etc)
can be immediately previewed in the print preview window, before printing.
- In print preview window the number of selected pages is shown in the status bar.
- In the main window menu the item Project is replaced with item File.
- In the diagram pop-up menu item Update is replaced with item Recalculate.
- New option: to recalculate diagrams automatically. If this option is not checked
in the project properties window, diagrams will not be recalculated automatically
after scheduling, cost calculation etc., and there will be the "Recalculation is needed" reminder in the diagram headings.
- New option in the structure properties: to Add new objects automatically.
If this option is not checked, objects created in another structure will not be included in this structure.
- Import/export data base size has been optimized.
- New electronic key driver and updated Install_Hasp.exe utility.
- New option "Values are codes" in the user field properties and document field properties.
EXPORT / IMPORT:
- New field "userfield_f_IsCode" has been added into the "userfield" table ("values are codes").
- Now the list of the project tables where a user field is used or calculated are stored in the data base.
Spider Project version 9.16 release 7 - (from 18.12.2006)
- New help system.
- Status bar shows the number of the rows selected.
- The setup of data transfer from reference-books is simplified.
- Now the scripts can be executed in the viewer version of Spider Project.
- The columns setup for monitoring data distribution.
Now the user properties window has the tab page 'Fields for monitoring'
PROJECT COMPARISON:
- Now the Materials, Cost Components and Material Sets project tables have columns
'Supply', 'Consumption' and 'Total'. All these three fields are separated into [Remaining],
[Actual] and [Cumulative]. And all of these 9 fields are separated into 'From this project',
'From compared project' and 'Difference'
- The 'Fields Available' dialog window has been changed. The 'Comparison' radiobutton and
The 'Original' checkbox disappeared. Instead there are 3 new checkboxes 'From this project',
'From compared project' and 'Difference'. 'Difference' works for numerical and date-time fields
- In the comparison setup You can select all the Gantt columns. If the 'Materials' checkbox is
checked fields 'From compared project' and 'Difference' in the Materials table is filled in.
The same with Cost Components and Material Sets tables
PRINTING:
- Now the printing has many new features and options
EXPORT / IMPORT:
- Now the project import from CSV files can use the column with the code BSC (WBS code) to create the hierarchy
- Now the project import from CSV files has Advanced Import Options
- Now the project export/import from CSV files supports Unicode
- Now the project export/import supports Primavera 5
Warning: be sure to update data base structure before using it
SCRIPTS:
- The syntax of the command PROJSETCOMPARECOMMON changed
- The syntax of the command PROJSETCOMPARECOMMONALL changed
- The syntax of the command SETDOCAPPLY changed
- The syntax of the command PROJSETRISK changed
- The syntax of the command PROJSETRISKCOMMON changed
Spider Project version 9.15 release 1 - (from 6.10.2006)
- Comma can be used as decimal delimiter as well as point
- Left toolbar in project portfolio has Project Gantt button
- New option: whether to copy row colors when copying project table as a new document
- New option: whether to delete empty rows when creating a reference-book from a project
EXPORT / IMPORT:
- Export into MSProject: now resource hour cost comprises cost of materials that the resource consumes per hour
- New table wbs_comp in data base structure
Warning: be sure to update data base structure before using it.
Spider Project version 9.14 release 16 - (from 27.09.2006)
- New log option: Save error messages into log file
- New scheduling option: Apply Activity Priorities
PRINTING:
- User can highlight desired pages to be printed by the mouse
- User can switch preview scale from current to 100% and back by double-click
EXPORT-IMPORT:
- Now data base export/import supports OLE-Documents attached to a project.
Warning: be sure to update data base structure before using it
Spider Project version 9.14 release 11 - (from 15.09.2006)
- New possibility to authorize sending e-mail through SMTP server can be
assigned in Spider Project parameters dialog box
Spider Project version 9.14 release 9 - (from 1.09.2006)
- New autocalculation in the monitoring table
- Report templates have a new feature: use the last day of week in column names
SCRIPTS:
- New command PROJPASSPORTEXCELEXPORT - export project passport into MS Excel
- New command PROJCRITICAL - save critical schedule of the project
|
 |