Latest release of Spider Project: 23.08.017 Date: 05.12.2023
Books

Spider Project. WEB.PI.DASH (second edition)

How to use Spider Project WEB + PI + DASH.
The book was written by Marcus Possi, Matheus Soares Viana Fonseca, e Mizael dos Santos Farias
It is available here:
In Portuguese


Spider Project. Methodology and Quality of Project Management.

A book on Spider Project was published in Brazil
(in English, 4-th edition).

The book was written by Marcus Possi and Peter Mello with the Preface and Introduction by Vladimir Liberzon.
The site where the book can be ordered:
www.spiderproject-book.com


Now available at www.lulu.com as:

Ebook (free)
Hardcover

Spider Project. Metodologia e Qualidade em Gerenciamento de Projetos.

A book on Spider Project was published in Brazil
(in English, 5-th edition).

The book was written by Marcus Possi and Peter Mello with the Preface and Introduction by Vladimir Liberzon.

Now available at www.lulu.com as:

Hardcover

 


© 1992–2023 Spider Project Team. All rights reserved.